Beaver Engineering Sdn Bhd
  • HOME
  • ABOUT US
  • PARTNERS
  • PROJECTS
  • NEWS & UPDATES
  • CONTACT
Select Page

PINTU MALIM SEWERAGE TREATMENT
PLANT ODOUR CONTROL SYSTEM

Status : Completed 2009

Installation of Odour Control System inclusive ancillary pipe works

Pintu Malim Sewerage Treatment 02

Pintu Malim Sewerage Treatment 01

Pintu Malim 01

Pintu Malim 02

Drainage Works for Sg. Kedayan Phase 5 (Floodwalls Kg. Menglait, Kg. Kiarong) – M and E Works →
  • Facebook
  • Instagram
2026 © Beaver Engineering Sdn Bhd | ISO 9001 : 2015 Certified | Brunei Darussalam